Portfolio

  • Ravenna Phase 2

    Ravenna Phase 2 Scope: HEI performed all of the mass grading and storm drainage construction as well as the overall...

    Read more

  • Cottonwood Creek Channel Restoration

    Cottonwood Creek Channel Restoration – Denver, CO Scope: Carried out under the direction of Southeast Metro Storm Water Authority, this...

    Read more

  • Compark Village

    Compark Village – Parker, CO Scope: Involving 300,000 yards of overlot grading, the construction of a new accel/decal lane, the...

    Read more

  • Wild Pointe Ranch Market Place

    Wild Pointe Ranch Market Place Scope: HEI Civil installed storm sewer and water utilities for this site for future commercial...

    Read more

  • Bowles End

    Bowles End Scope: This commercial business park required 66,000 CY of cut/fill, 14,600 CY of over-ex for streets, and 3000...

    Read more

  • Red Rocks Country Club Lake Lining

    Red Rocks Country Club Lake Lining Scope: This project consisted of repair to a 12 acre surface lake that had...

    Read more

  • Castle Rock Conoco

    Castle Rock Conoco Scope: Turnkey site development for Conoco’s Gas/Foodmart, Applebee’s and retail site development including all earthwork; water; sewer;...

    Read more

  • Black Hawk Parking Lot and Access Road Construction

    Black Hawk Parking Lot and Access Road C

    Black Hawk Parking Lot and Access Road Construction Scope: Design, build and complete the over lot grading to construct a...

    Read more

  • Thornton High School Site Improvements

    Thornton High School Site Improvements Scope: Reconstruct entire site for Adams County High School to include; over lot grading; the...

    Read more

  • Cherry Creek Reservoir West Concession Plaza Site Development

    Cherry Creek Reservoir West Concession P

    Cherry Creek Reservoir West Concession Plaza Site Development Scope: Reconstruct the park’s west concession plaza area including grading; colored and...

    Read more

  • Railroad Interceptor Sewer Line

    Railroad Interceptor Sewer Line – Leadville, CO Scope: This seasonally difficult project required the installation of 7300 lineal feet of...

    Read more

  • Wild Pointe Onsite and Offsite Sanitary

    Wild Pointe Onsite and Offsite Sanitary Sewer Scope: This technically demanding project required the installation of 8,000 lineal feet of...

    Read more

  • Sutton Pond

    Sutton Pond Scope:Designed as a water source for the Ravenna development, this pond required 450,000 cubic yards of cut to...

    Read more

  • Lutz Reservoir

    Lutz Reservoir

    Lutz Reservoir Scope: The construction of this reservoir was the reconstruction of an existing reservoir in Brighton, Colorado. It included...

    Read more

  • Lower Sacramento Creek #1 Dam

    Lower Sacramento Creek #1 Dam Scope: Lower Sacramento Creek Dam required 30,000 CY of excavation and 187,000 square feet of...

    Read more

  • Virginia Canyon Drainage Improvements &#

    Virginia Canyon Drainage Improvements–Phase II   Scope: Located near the famous “Oh My God” road above Idaho Springs, this site...

    Read more

  • Maddox Reservoir Rehab

    Maddox Reservoir Rehab Scope: HEI Civil was on the list of select contractors to bid this project, which included 19,613...

    Read more

  • Stillwater Dam and Reservoir

    Stillwater Dam and Reservoir

    Stillwater Dam and Reservoir Scope: Complete turnkey general contractor for the design build repair of a 25 surface acre reservoir...

    Read more

  • Grange Hall Creek Channel Improvements

    Grange Hall Creek Channel Improvements Scope: General contractor on the re-alignment of an active river channel which included 33,000 CYS...

    Read more

  • YMCA Effluent Reservoir – Snow Mou

    YMCA Effluent Reservoir–Snow Mountain Ranch Scope: Construction of an 11 Mg effluent reservoir with critical schedule and constraints. Project consisted...

    Read more

  • Western Hillside Reservoir

    Western Hillside Reservoir

    Western Hillside Reservoir Scope: Construct a high-hazard dam and a 129 acre foot reservoir at an elevation of 9,000 feet...

    Read more

  • Rocky Mountain Arsenal Waste Water Treatment Plant

    Rocky Mountain Arsenal Waste Water Treat

    Rocky Mountain Arsenal Waste Water Treatment Plant Scope: Construct a four cell waste water lagoon system and two individual treatment...

    Read more

  • Wild Point Phase II

    Wild Pointe Phase II Scope: The extension of Phase 1B, the work consisted of additional building of paved roadways and...

    Read more

  • Tessa Mesa

    Tessa Mesa

    Tessa Mesa Scope: This project consists of the construction of access roads, installation of utilities and paving and signing. It...

    Read more

  • Ravenna Phase 1A and 1B

    Ravenna Phase 1A and 1B

    Ravenna Phases 1A and 1B Scope: This major project involved the construction of a multi-phase golf course and a 243...

    Read more

  • Wild Pointe Phase 1B

    Wild Pointe Phase 1B Scope: This showpiece development located west of Elizabeth, Colorado required the construction of 14,000 lineal feet...

    Read more

  • Stonegate Filing No. 20 Phase B

    Stonegate Filing No. 20 Phase B Scope: This is a multi-family development during the construction of which, HEI Civil moved...

    Read more

  • Cherry Creek Springs Filing 2

    Cherry Creek Springs Filing 2 Scope: Complete turnkey general contractor for new county and private roads with fast track scheduling....

    Read more

  • Keene Ranch Filings 3 and 4

    Keene Ranch Filings 3 & 4 Scope: Turnkey construction of single family development with lot sizes ranging from four to...

    Read more

  • Castle Ridge East Subdivision-Ridge Road

    Castle Ridge East Subdivision-Ridge Road Extension Scope: Turnkey construction of 6,000 LF of road; install 5,000 LF of ductile iron...

    Read more

  • Colorado Golf Club

    Colorado Golf Club Scope: This project required the excavation of 400,000 CY of material and the construction of 36,000 lineal...

    Read more

  • The Divide at Kings Deer Golf Course

    The Divide at Kings Deer Golf Course Scope: General contractor for the design build of an upper end pay for...

    Read more

  • The Ridge at Castle Pines North Golf Course

    The Ridge at Castle Pines North Golf Cou

    The Ridge at Castle Pines North Golf Course Scope: Performed the mass earthwork and storm drainage portion of the construction...

    Read more

  • Shaffers Crossing

    Shaffers Crossing

    Shaffers Crossing – Jefferson County, CO Scope: This technically demanding project saw the complete reconstruction of the intersection of Highway...

    Read more

  • Hess Road

    Hess Road – Douglass County, CO Scope: 2.6 miles of new roadway was the objective of the Hess Road East...

    Read more

  • Southeast Arterial Corridor Road

    Southeast Arterial Corridor Road – Castle Rock, CO Scope: Southeast Arterial Corridor Road (SEACR) connects Plum Creek Parkway to Ridge...

    Read more

  • Tower Road Improvements

    Tower Road Improvements – Denver, CO Scope: The scope of the work was the replacement of a narrow bridge and...

    Read more

  • Tomichi Road Paving Project

    Tomichi Road Paving Project Scope: This project included the reconstruction of approximately 3 miles of existing county road within an...

    Read more

  • CDOT SH 86

    CDOT SH 86 Scope: This project included widening and additions of accel/decel lanes on SH 86 in Douglas County. It...

    Read more

  • Russellville Road

    Russellville Road Scope: Complete turnkey general contractor for the rebuilding of approximately 4.5 miles of existing gravel road for Douglas...

    Read more

  • Reynolds Reserve

    Reynolds Reserve Scope: General contractor for the construction of approximately 9,000 LF of mountain road including timber clearing, rock excavation,...

    Read more

  • SH 67 Tunnel and Culverts

    SH 67 Tunnel and Culverts

    State Highway 67 Tunnel and Culverts Scope: Build a highway bypass around the existing Little Ike Tunnel, which accommodates travel...

    Read more

  • Upper Beaver Brook Dam

    Upper Beaver Brook Dam

    Upper Beaver Brook Dam Spillway Construction & Embankment Modifications Scope: Reconstruction of a high hazard dam, and the construction of...

    Read more

  • Bullseye Airfield Construction

    Bullseye Airfield Construction

    U.S. Air Force Academy – Bullseye Airfield Construction Scope: The scope of work included the construction of the airfield; taxiways;...

    Read more