Wild Pointe Phase 1B

Wild Pointe Phase 1B

Scope: This showpiece development located west of Elizabeth, Colorado required the construction of 14,000 lineal feet of paved roadway and shouldering and 38,746 cut to fill. The development provides roadways for individual lots owners. Also, 13,000 feet of water, and storm drainage was constructed varying is size from 18 inch CMP to 36 inch RCP. Accel/Decel lanes were constructed in two locations to provide access to the development and State Highway 86 was overlaid in those areas. Extensive erosion control including inlet protection and seeding was also accomplished.

Comments are closed.

to top