Scope: This technically demanding project required the installation of 8,000 lineal feet of 8 and 10-inch sewer pipe. It was challenging because the installation of the pipe was 10 feet below the existing water table. It was necessary to dewater the installation area and stabilize the subgrade before the pipe could be placed. Integral to the project was the construction of a lift station and two directional bores beneath major roadways.