Red Rocks Country Club Lake Lining

Red Rocks Country Club Lake Lining

Scope: This project consisted of repair to a 12 acre surface lake that had leaked since it was built. We excavated approximately 25,000 CYS of select fill from within the drained reservoir for liner cover. The project originally bid with the need to screen material to generate this fill, we value engineered the project to save approximately 40,000 in screening costs. The project bid prior to draining the lake. After it was drained it was realized that the lake had over 20,000 CYS of un-anticipated muck in the bottom. We developed methods to dewater, remove and replace this muck on site. Other quantities included, 525,000 SF of 30 mil PVC liner, 20,000 CYS of liner cover, rip rap rundowns and rip rap dam embankment protection.