Scope: This commercial business park required 66,000 CY of cut/fill, 14,600 CY of over-ex for streets, and 3000 feet of pipe installation for storm water, and water ranging from 18 inch CMP to 48 inch RCP. In addition, 1500 feet of sanitary sewer were installed. Also included were curb and gutter and both asphalt paving and overlay requiring traffic control provided by HEI Civil. The biggest challenge was the relocation of 1600 lineal feet of under drain into underground 48 inch RCP at a depth of 20 feet and more.