Black Hawk Parking Lot and Access Road Construction

Black Hawk Parking Lot and Access Road Construction

Scope: Design, build and complete the over lot grading to construct a 40 acre parking lot utilized by the City of Black Hawk including a three lane access and service road. The project included ripping, dozing, loading, hauling and placing approximately 80,000 CYS of rock. The scope also included field engineering and construction of a two lane asphalt road up the side of a mountain with existing slopes of up to 40% to include clearing and grubbing over 10,000 trees; and the pioneering ripping, dozing, and hauling of approximately 150,000 CYS of rock.

Comments are closed.

to top